The first annual report of Street

Commissioner George A. Sherron wa

submitted to the Council last Tues-

day night. it was as follows:

,srn‘EEr‘, DEPARTMENT REPORT.

October 8, ”13—October 8, 1914.

Prior to October, 1913, the street,
in-
.teresta within the limits of the for-
mer Town of Norwalkfwere handled

highway, sewer and engineering

by various departments independent

]y of each other, and with little or no
attempt at securing the organization
necessary for the achievement of et-
Select-
men of the Town of Norwalk had the
care and maintenance of all streets,

flciency and economy. The

highways and bridges in the town, bu
by the contribution of a sum of abou

$3.000 they were relieved of the ne-
cessity of caring for those tow‘ roads
l'l‘o

within the limits of the cities.
each solectmnn was assigned the di
rection of the work in a certain dis

trict and all work was done, either
by contract or under the supervision

of hired torcmen. These foremen em
ployed such men as were sent

them by the selectmen, this method
unfortunately making it difficult for
secure

of conscientious foreman to
efliciont laborers.
Each of the former cities of Nor

walk and South Norwalk had

tied the street
complaints, etc.

work, attending

but their efforts were

interference. All

gineers.

. g “D
Tl'ic present Street Department of

the. City of Norwalk, represents the
fusion, under one head, that of a
Street (‘ommlssioncr appointed by the
Council. October 8. 1913, of all the
various departments formerly in
charge of highways, streets. sewcrs,
engineering. etc. ill the old Town of
Inorwalk, and to this depar'lment are
referred by the City Council for in-
.vcatigation and report, all matters
pertaining to engineering. _

" Front the preceding description, it
may readily be seen, that under the
old regime, there was It) co—ordina-
lion between the ~various departments

.within the limits of the Town of Nor- ‘

walk and consequently the first step
taken by the present department was
the collection and organisation. of all
thesé various ,loose (in igloonede»
partment, the duty 0 ‘ which was to
nerve, irrespective ofsection or party
'jolitlcs, all the.citizens of the City of
Norwalk in as efficient a mannervas
possible.
The Commissioner of the present
department is also. the city‘ engineer,
the two otflces having. been combined
by order of theCo‘uncl’l, who also an-
t'horized the commissioner. to.,‘employ
all the assiStants necessary in the
organization of thedepartment. _
The department is divided" into two
‘ ‘7- !inreaus or departmental“. Depart-
. about of Streets, Highways and Sew-
ths. and the Department of Engineer-
. j‘ngand Bridges. The. department of
3 streets. highways andsewers has the
. lchre‘ and maintenancet'ot ail‘ accept-
:édtst'reets, highways, sew-ersand per-

, fl‘llyll‘efilltyavements; the collection at“

garbage, and refuse; and: all. other

. ' rli connectedwdtb streets and'h'igh‘»
" ys.‘ .j‘f'i‘lieo‘tl'dpai‘tméntl: of:“ engineer;
ing takes 'chargerofiall tbel‘en‘glneer-
in; of wacky not oth'érwlse'pi‘o-
_ gilded rm" Thlsl’worlrL‘includes street
,layout‘s. curb gradés, estabiifihmeht or
necessaryfi bench>~ marker and fixed
points for mango-alt Wilda
”coined-glow tog newteewersgéimce
merits; Bridgman-"o tan'dvvalF, m.
plans‘fimrch'aflit} necessary in» t

 

 

 

 
 

to

a
Street Commissioner who superinten-
to
These men worked
to secure the best possible results
vcry often
frustrated by political and personal
engineering was
done by a Town and two (‘ity En-

.‘h

 

m

still! 7 , ., ,, , .
vanisis'iiiiiri‘Sr‘E’r’eaee
to positions of severe, conduiti, etc,
may be obtained. from this dolor)-
ment... ‘

As will be nodded, there are three
assistants, two street superintendelfii
and an assistant engineer, reporting
directly to the commissioner. These
assistants are directly responsiblefor
‘- the carrying out or all plans, instruc-
tions and‘otders or the minimum.
missioner, and report daily on spec-
ial blanks, detailing the work, ’ its
character, location and the distribu-
tion of‘expense. These reports are
examined bylthe commissioner and
when passed, are turned over to the.
clerk, who checks them against the
Weekly time books before the pay-
roll is made up. Owing to this meth-
od, the. Street Commissioner is fami-
liar with the details and costs alt ev-
ery piece of work up to any specified
time. .

All complaints are carefully investi-
gated and when justifiable are rented-
ied, provided the money is available.
if not, a record is made of such need-
ed repairs in order that ”' provision
may be madefor‘ them in the next
budget.»

It was found upon investigation.
that the roads in the Four} hand Fifth
Districts were in very poor condition
and plans were made and methods
devised for the handling of as much
repair work and construction as our
limited appropriation would permit.
The important roads in each district
were designated primary roads and
those of less importance, being feed-
ers to or parallel with the primary
roads, were termed secondary roads,
the idea being.~ to repair, construct. or
reconstruct as much primary road as
possible, because such roads after be-
ing placed in proper condition could
be maintained at a slight. cost p8r
yard year. Eunds couldthen bo'used
for the development of the more im-
portant secondary roads, and so on.
until all of our roads were in good
condition, and in the meantime main-
taining what we had already gained.
The maintenance of all roads not
paved with a permanent or semi-
permnment pavement may be com-
pared to a battle where neither side
can afford to rest or grow careless.

 

S

f
i.

There is no such thing as a period of remaining DiPI‘S were I“ "’7 W con’vtogether. (known as a mixbd collec- Summary.

municipal inactivity; one must) either crushing-plants and one road roller dition. the footing extending only two tion) and used to fill in low land. Men Appropriation for the 5th ‘

mov‘fl‘ forwhrd or backward, and had been operated for several years feet below tho'lrlver bottom. These are employed to level oi! dumpwd District . ................ $57,695.00

when highways and streets are neg- and little °r M attempt had beenpiers were reinforced with new 100‘" cover the garbage whener possible. Special approxlrlfllloll for

lected because of carelessness, lnefii- made '0 maintain them in proper con- logs of steefilnd’concreto and '19 "pi ' Sidewalk Expenua. “‘9. WWQSLUBFMSQ it":- A-WW
. clency, or lack of funds, the damage dltion. consequently the M of mam'plnccd around 191911110? protection; Item So, 114813.08): An inspection of '3 “4‘ ‘ 1' :___'___1__

”sum"?! In one Y9“? can only be re- tenancs was more expensive than it The Red Mill bridge ‘5 only temporary ‘. sidewalks was necessary in order that Total Appropriation ........ $62,295.00

mired ’bv the work of several years “mm have ”9““ “”1" "mm“ °°“' and a new bridge 9‘10““ b° ”“m a“ data could be obtained to: a sidewalk Less amount to 4th District 15,000.00

and the expenditure of a much lar- dltlons. ‘3 4300“ as ”‘6 conditions warrant. 'N‘POTL ‘

tier amount of money than would have. item No. 5—«Trnveling expense; item 'No. '2-——Cross street bridge,

been necessary had the matter been
taken in time.
The road problem even at this
date. is not properly considered by
the citizens of the average small
town or city. Good roads and streets
are an asset to any community and
a few dollars extra per year for high-
ways means it saving of many times
that amount to the individual' who
uses the roads, and these individuals
constitute themajorlty of our taxpay-
ers. Good roads meantcltenper haul-

I

the cost of labor and repairs to two more to faulty construction than the ered by‘the collection is live square
road rollers, two crushing plants an
two road machines.
the cost oi maintaining the depart.
.mcnt automobile, gas, oil, grease, re-t
pairs and tires for a period of nine
months with a mileage of 9.000. The

Ill-15.30). it was necessary to make (31170030,) The old bridge at this:
several trips to New Haven. Hart‘Epolntproved to havencnpncltyof only

ro riatlons were made for layouts on District ,,,,,,,,,,, - ,,,,,, 3 41295.00
ford and other places on department Sig tons at a speed of‘tour miles per £19510“, and Laura streets and Quint- Amount spent in 5th my '
business and “““h expenses were 1‘0“? “'“h no impact. As "“5 was 1'” ard and Seariew avenues. Seav’iew U‘ICL,....f1»...-n.s....$37.m:29
“mm“! “"d" ”“8 “em: “1°" "‘9 modern standard 1m. high" avenue was carried through but the Amount‘due on BridgeiconV '

"em NO- G-Ilan'a T00” “123-33)an bruises-ll W“ “WWW" 3“" a‘others were abandoned. This expense tracts ...... i...; '9.’:7“2.00
includes the. cost of such small tools contract let for-“the construction of a is for the necessary engineering on ,
and equipment as were necessary for‘modem “‘9‘“ bridge“ with concrete the work. ‘ Balance moth District ..... .71
“”9“ “d "’“d “'k ““d were “55°" and “‘de‘wl‘s' The “mm“ “8 Sewer Expenses. ........ Appropriation iro‘r its Dis.
“TWP; ‘2 “2"h‘“‘i‘m?“a' 3:39 35) .‘mt “Mme“ 9‘ m" end °' m" "““i Items No. 1. MAE—$171.9??? ‘trict ..... . ....... $54,539.50
tem o. --.c 00 sgns . ..year. ‘ t l e t e cos 0 a , .
It was found necessary to place addl-I Item No. 3—Millnrd street bridge ”“5 ltcm is "c u ~ The “0‘9 item includes

 

 
 

genomic: w you“ biotic Several at...” wet-gt of ingeste- bogus W or gum mm‘etneo of Narration! South Norwalk,
“is"‘ttié‘ mt'trnfliig District, the im-ivéfiimsi‘éd’am‘e‘m cyst-eon the following streets: Wt was purchased at the valuation placed
mar City of South Nomalk or what on under this item. _ ‘ . streetrenestnut gtreet, Concord street, thereon by a special committee.
is now the second Taxing mama,‘ item No.“ .. var-ts and Willows sneer, West street, Fair-dell; item :N'o. 35-61732-59- . Further
the tonne; fistNog-wgg pm Dis-{QZ‘M-zz- This 9‘ peels-tor the care arenue, High attest, Taylor arena, equipmeptvwag-necessary to ogrry on
trict whicirirnovr theei‘hird Taxingind maintennno!’ of existing culgerts Butler street. Elm street, spring L the war-got Lug depanmgpt. Aspeclzn
District, ind [West Noajwalg, Oran-II!“1 drains “9f- for ‘hB-VF°“”!§‘°‘ Eli-8t avenue, Fort Street. Osborne av) committg nth-three, each one a man
bury, Rowayton, Strawberry Hill, etc)“ he“ ones in order to my drain- nue, Crescent street, First Distnfllotamiliar with the work-required were
The. combination of First, Second and?” conditions and to protect the Keyser avenue and others. it also 1n-1 requested repurchase sun horses, with
Third Districts makes up our uni . - ;. . eludes the cost “construction of rotate necesflsray equipment. These men
proved area and is termed the 11‘0th item 3“- s—Maintenance 01 high‘ inforced concrete pavements on South worked 1111an p, the. depart
atoning District. The {01“,me 1,, d;wm,‘t$6,193.413 This item latitudes diagram and Van Zuni avenue. It'zment and spendingtbetr own time and~
- ‘ - . the cost "of grading. cleaning gutters. further includes the cost of excess ma'émoney without remuneration, pur-
explanation of the expenditures 111,th bushes along highways, patch- tcrial to the extent of about $660,~and:cpgsad the livestock and harness re-
eneh of these districts. {mg and gruelling and general re- apparatus for the construction of con-iqulmd, and their work was thoroughly
~" ”FT” DISTR'CT' inflirs to cum“ roads, such 35 in” crete pavements. .Most of the ab0V83’satisfactory; the city received its
Administrative Expense, $.4'901'15.‘ {properly be classified as maintenance material is still on hand and the 819-ij5 worth. The _cost of these
. mm 1‘ 2 lmd 3 under ms hwung‘work. as well is filling in and Swim: paratu‘s we also have for use in the'horses, carts, harness. em, is charged
in the WM!“ “ale?“ are the sat-5“ both end: of the: Fillow Street building of additional concrete pavoiagamfl this “gm,
aries of the comnussloner. assmtantsmfidge; a job that Was turned over 1.0 lnents. If your nodal-able Body will investi-
and clerk. These salaries were. fixed ' 1 item .\'0. 7.——Snow removal (3840I'lgate, you will find that while the totat
by ordinance P?9Derly passed by “Edition. “‘01.) TWO SHOW Storm-5 Occurred dur-' expense may seem large. a great p01“
my connoill‘and are paid weekly ml 119m 30- HMSWC‘iO“ 0‘ new ins the year; one cf wlllch “firemen-”ion was for equipment. apparatus.
”‘9' “ammo?“ “mm-V ‘° the‘highwuys (9,349.50) Under this head‘ tiondliy heavy. Tl .- sidewalks, werejbridges‘ sewers and mum, and per.
commissioner ”“3 clerk. These em- in; is included the cost of conetruc- partly cleared by the city snow plows: mancnt pavements and Cue amount ac-
ployees are subject to call for duty at tion and reconstruction on various and the snow was removed from the tualiy chargeable bs an “W is be-
an hours or the day and night, seven roads as lifited below' Three types 0‘ Important Shreets in the Centers. Alta‘ww that of former years' A150 consi“
days a week. No additional pay for construction were employed. '
overtimeor extra work is received by bound macadam. one course run of the were removed and dumped into the‘

water gether many thousands of" cubic yardsle, that the city 0! Norwalk today is
themmndfiuring the year they have bank gravel, and t“'0 course crushed fiver, traiiic conditions becoming prac—V

 

 

 

 

this department in an unfinished con-

the second largest, if not. the largest in

. . {the state in urea—26 square miles.
had no vacations. TH“ oflice also hasimvep The 13"” ”'1’" was found to tically normal “'5 9. 511°“ time. The:with more than 160 miles of roads and
been open every Saturday afternoon give the best results, service and cost cost of this work was included in ‘hislstreets, 38 miles of sewers, miles 01'
during the year until 5 o'clock. All‘baing considered. New roads were item. . pavements and a population of 26,000
of the oflice work, accounting. immnstructed on'the following streetn~i them No. S—(T‘Iing ($4.075.06.l Thegpwme. '
writing, filing. etc. ,is handled by 0m~Pery avenue. Cediir street, F 1110‘” cost of olilns “11 dirt, 81‘3"“! and mac-i The street department is now on a
clerk and the following account! street, William .Streety'l‘ierney street. gdam streets and roads in tbo'll‘ourtlinmsiBess busis' new records are avail-
speitk for her ability and accuracy, Beacon street, Willett street, 0'3" District is represented by this amount; able and old ijecords are more acces-

Gencrai‘Expenu. avenue. Crockett avenue. “WWW-Approximately 400,000 square yards 01‘} “hire and more and better service can
item No. 1-Oliice expense ($267.74) avenue. West 8099*. MCKmléY 9W5?» road surface were oiled with one aPPlee rendered to the citizens than ever
includes the cost of printing, station-rand in the Bell Island section. "cation of Standard No. 4 Road As—ibefore . ,5,
cry, postage, telephones, record Maintenance of Bridges. phalt. - M ‘ l1 1 d 111
books, advertising of contracts, etc. item No. 1-MnintenanCo 01' bridgesi Maintenance of'Trees. ‘ '1“ tonclnston I ma :0 en en . :
item No. z-Engineerlng expense ($6,172.52) This item includes the cost; hem No. 1—Maintenance, removal, , ”will“! 0; "1‘9 1W9fi§lteégrmy 1:13:25
($1,571.95) includes the cost of sun of replanklng and rebulldlnz one of 91mm “.1 spuymg ($1,0w,36.l i3“? “'16.”; K v. :mnzdgdiem
veys, inspections, maps, plans, acces-'the allotments oi the. Bf“ Island The cost of caring tor the trees in this an succ as “ a Sh . f 'liu de-
sorléé. and all expenses properlymridsel the emu” 0' a “”90”” district is included in this item. ’slogfref‘ mag“? “:1 ”0:13:51: .1.
chargeable to this account, includinglbl‘idse at the “90 Mill; "renairs ‘0 elm trees were sprayed at a cost of""01 ‘1’: "i “than: thzriouncii foryits
the salary of a transit man or alsls-{Com'ilm‘k Hill “"9““ bridge and the 8810. “on :30 nhoura of need and our
(ant englneer. cost of rebuilding Broad street bridge-l item N 0.1—Collection, including 111- ‘ “99°” .111 “1":le t tor a wh e?
ltem No. 3~lnsurance ($134.74). 1" “'1" be remembered ‘1‘” the above bar and supplies and maintenance‘of WY golodd tie” ,3 8’ ails de r2? to
This item covers the cost of tire and mentioned bridge 001189800 immedia- dumps ($3,939,193 The Street Depart- “31‘: "’1‘" him l? fizllsptlheddepirtmem
boiler insurance on part of the scalp-1‘91? following ”15 “”51”“ 5‘0"“ ment removes garbage, ashes, and re- 5 e P

. ., . ,~ ' ' . ' uintard ,
merit of the department. and “00d of March 1' 1914' ”3° cause fusef roln all points of the Fourth Tax- “a” hung organlzle‘d. b itt d milieu!” on Q_ ....... 7 NW.
Item No 4—Malntenance of Equip-bemg the settlement “ii dls‘intergdla‘; ing District, when the material‘is ’plno Respect: 13:1; 11!:th Engineeriiig. '6“ Seavlew .
' . tra ier, u . . _ Q, . » , ,
ment ($1,574.96). This item covers tion of the “95‘ can l ed in proper receptacles. The area cov Street Commissioner. Ave. IIIIIII .. . . . . . . _‘ “-

TAKE 3 ST COM. GAL ONEL

financial statement of the Street
Department of the City of Norwa‘lk,
Conn, for the fiscal year October 8.
lino-«October 8, 1914.

d action 0‘ ”‘9 river. The pier W” re~ miles and about 21,000 people are ben-
built on a pile foundation capped with ellted. The collection was taken over
(‘ODCTNQ “‘1’ “'0 feet thkk' and from the Sectond District early in 1914
the W0 “”9“ arches rebuilt. by con- and collection started in the First
tract let to Ml“ Daniel Toomey. It wastiand Thlr‘d Districts soon afterward.
found “W“ “I‘m“m‘m that “‘8 two The garbage. refuse, etc.. are collected

It also includes.

Street Layoutl.
Items U0. 1. 2, 3, 4.—-($ll’1.96). Ap-

Amount available for 5th

 

sewer work, cleaning, repairing, con-

, $15,000 from 5th District
structlon of sewers, catch basins. cul-

ional school signs reading “Schoor‘,5850.00.) On March 3, 1914, the: old

 

constructed by this department dur-
ing the past. year, including water
bound macadam,_ona course gravel,’
tar. bound‘ macadam, and .twa cont-ital
crushed gravel. The -depll.l‘.tmont‘(

plants which were thept‘busy duringlg

chincryt‘ was Inadequate and. Lunch for

 
 

 

smooth, even surface was obtained
the use of ‘a plankroa '
severe rdiir storm, will
Was-’sfill‘weti " K; '. .
.3. nthegacoounts» of this: 11de
“Ere-cementum” two main hills
rations. One for memoir! ‘
cor-i the Fifth 'Thxhig"15fmtcti

 
 
 
 
 

 

 

ed no office equipment or records. Cer~ piveme’nts (34.239544.) Tholpnvementa
tain street road equipment as well as in the center of the city. are mailed
the department automobile are includeldlllll'. and all ’the- pavements :11: the
ed in this item.

_ §360.04). To carry on the work or the and removed by. the filer}? c2132?
owns two complete rock crushing engineering department it wan-«neces— The expensebbthisrwor t}

the greater «part of the year crushing‘j-od,’

and. the other» -of-s the=ivtandemittn§tT3During. the 's‘evere‘tstorm" ol«~February,
These. machines. were used voltmeter-4914; several communal. “terrace“-
possible. butt'in . a .. city-t of.“ this: size; or! relative “to ' tho-2- snowflrlttinga-into.
where many,piéoesx-ofroadG'arecbemg deer ctlt'tt‘taiid rendering severalbigiir.
repaired at eimrmipointskthe mama’slmpasso‘bie tp‘cortalnvpolnts. The

 
 
 
 
 
 
 
 

of’s'treettl in the Fourth Taxing Dtst etc....u9,ede0ll'th°.w9*1?"1“““3 “"1““ Traveling ”9°?” " 353-9 ’
. . . . . 'trictk’nn'djmorémthan fl'vesixth lift-hi8} ' lbiilld!p§..Engntsfi-g _ . " Hand‘flm"““”‘7“"""">' 12:18:
'°°“'*"“3l9”1“3*““’ “WM“ m amount ”or mutation, on as my ItBM:‘N°~‘1;—-st~lflyzih25),tincludes-tits'5°h°°“'=‘9‘g“3 ' _- 1 '3'. ..
- . , x1 I F f: ,. 3-.

memos: which werebiied - m

able, they were charged against this

- r .r . .

ing and a reductioniin the cost of re- Crossing," near several of ourtim‘bel‘ bridge on Millard street (30;! Vertn and drains. There are a‘?0ut 33 :3; :3: 11:13:: roll-GB in Purchase °f gquipment

. . ‘ schools. lapBEd and it was replaced by a mo miles of sewer! in the district, most of First District Equipment..
pairs ‘9 wagons, carts and ”Wk“; .pumha“ of New E at merit ’em steel beam and con‘crete‘ bridge“ hi it , examined and portions of Amount spent in “h Dis' Iecond. Districth'lllduipmént. .
cheaper hauling because'a- larger ton- Item No. 1~($895.13.) (311111: expense, having a capacity of fifteen tons. This :high 3;: flushed and cleaned. About trict ................. 58,952.47 New Equipment, h arses, ‘
1:1.th [flateziflaifl b33231? M 0:8 really an “359‘: Inellldefi the c0“ 0‘ cOntraCt was not completed outbound-330 catch basins were cleaned twice Balance in 4th District 35870:; wagons.‘ carts, , harness,
mm; the Wear. a" “(1232:: a:Jotllce equipment such as a tynewrtter, of the fiscal Yeah—‘— 1“ d in special cases, three or .more Note—4t has come m tigmmc‘e.“ etc. ....... .. ............
reduced to-n minimumu To shnr up]letter at"; (can; “3le lctnblnetss dup: 'FO’UIRTH DISTRICT} times. Twelve no; glitch “2:213:33 this department that bills of the
good roads mean lower cost of pro-£22323 in: thiogrlesen? 3:1“: 5:. Pavement and’Hiquy 53‘9“.” 2:33. legmgxingec 5:31;. A new Town Of Norwalk have been voted ”.m'h‘ ‘
dusgsrdtglvliygigezzegogdgflhave beehgpartment when new cities and inherit: Item No 1-Cleanlng and sweeping. sewer was constructed on Clay street. paid, and there being no funds avail- Total ....... . . ”$539

from Spring to- West: street and about

4—.

t

Maintenance, repairs and re-
Cleaning and flushing sew- ‘

Cleaning catch basins

Construction of new catch
Maintenance. repairs and re~
Construction of new sew.

Horses, wagons and carts..$ 1,680.35-
I-iand tools ............... .

Maintenance and repairs to “

 

 
 
 
 
 
 
 

., . .__..._.... .

-_ m.--

ways .,......... ...... .u

 

"s

 

.firldqe Expense.
Magnetism; of mm m1
‘ guiding mad St, guides”;
Crass St. Sridge :.;.. 71,
ma St; Bridge ...... _”

 
 

 
 

.1...

 

 
 
 
 
 
 

-, $8.. 4
................... $37,

 
 

 

Total

 
 

room-h bismlcr.
Pafyement and Highway 2::ch
Cleaning and sweeping pave-' “
meats ................... 8 4,233..
Sprinkling . streets .........
Maintenance and repairs to
permanent pavement
Cleaning gutters
Maintenance and repairs to
highways ............
Construction of_ new high-
ways. most). Main. 51.,
Van Zandt St., Butler St,
Elm St., Fairfield Ave. and
High St, Fort St., and en-
gineering and inspection
on East Wall St. ........ 13.0.2
Snow removal
Olling

 
 

 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

. ............. .....

Maintenance of.1'reu.
Maintenance of trees, includ-
ing removal of dead trees , .
and spraying. ........... 8 W
_ $1.060
Removal of Rotting-l
Collection, including labor,
material, supplies and
maintenance of“ dumps..$ 8,0801?

‘..

 

$3.939.“
Sidewalk-'51:” ' ~-
Inspection of sidewalks .3“ 13.08,’
' Street Layouts. ‘
Engineering on Meadow .
St. ...................... S 88.0.
Engineering on Laura St...

b
317.1. '
Sewer Expense. .

placement of sewers ....$ 35;!

GMT

.....................

basins .............. . . . .
placement of culvert“ and
drains

--.. ........ n .....

PFS

....................

 

$3,745.83
Maintenance of Equipment. T

 

3334:: r

. 31,9933
‘ Building Expense. '

buildings.

up”. ... n

....................

tags

5 ‘ ,.
gt.
.

 

 

 

 

 

160 feet of the Bun-m avenue-sewer “mime“ Only those bills passing

 
 
 

 

through this department and when:
proper vouchers were tiled, have been
taken. into account in the financial

wowreplucedfby 12-inch tile pipe. Cons
nectlonn" were made with ’thelWinileld'
street sewer at Bridge street and'Cen-
ltral avenue. and carried beyond .tue .
ilint‘lte of the newstlite road; in order

' ' / .
~ ' ent need not-be disturb-7
street. that the pavem Commissioner's salary $110039

city are'swept‘once it weeki M's-mach}

item No. 2—Eng‘ineerlns equipment lite. “19 SWWPID'SB‘ ““3 ‘p‘°k°d"“ “9

anemia. .
V _ FIFTH DISTRICT.
Administrative ~Expenee.

ary' tH'."purcI_ia;se aatranslt. leveling against ”“3"“

apes,“ draughting tables. paces-i 'tltem‘ immelgasllrinkiing.

 

. . era are constructed.

gravel, boulders, ctc.,in various RWY-”sonogcard tiles anti a map safe. All ($467.25.) Pavements. .wero sprinkled,” “h;:]$:::::ewof'EQulpment. . . Salary of assistants ...... “:1 2,151.15
81 banks. With this' crushed motor-{city engineering as Well ‘33 that: win order to lay‘the dust and dirt! roads, Item‘ No 1___(51‘660.88). This, m; salary oi: clerk (10 months) 650.00
‘31 roads were built that when propel-the state aided highways within our We” ”rink!“ in some cases before] eludes the cost. of feed, shoeing. bed- , V r "““‘—"
13’ Oiled: Mintalned. etc» ' fumisbtid bordérsfis handled by this department. P0“ oil “tanned,” ‘ . 'dlng, harness; repairs, repairs to who “ $590115
excel-loot service. -. These roads-resist.The work also includes design ofl ‘Item‘ No. smuamtenaneewof Dem. Vans and carts etc; The live stock has General Expense.

the wear, and tearof'tranlc verxrwsll‘ibitrns,‘ sheds; and» bridges. All maps “9‘“ ”Emma” ("59m”) ‘ Includes been “commending“, until at Office expense '. ..... . ..... $1“ 267.74
and are anally maintainedrw’l‘he- de-hnd plans ,. are~camlullyand convene wfit‘Ofanecessary repairs tofpnvo;entt;‘ this time the hemp-infant has eleven: Engineering. expense, includ-

partment also; ”3565’s“ ,two.- steamiently tiled. i g I 3 ‘ patchingbilchdparnliegtg hiudlggu. horsesai'x of'wbicb are used for-street "111.5811“??? of assistant on . ,
road»rollers,-.on'o 0515?t0'ns:=weight,.ot « . . Road’Ekpmn . t -. (mitiosgilvzeragtreeifgaliroad avenue. work and five :95 the '6.""."“‘ 9f gineer """ .....1.571.§5l
the type known».aSeJ'thraorwheeledrl . dimmer 1~l-8nowrremovak ($1937.). . ' ' ' ‘ Jam”; ' insurance ----- - ------- 434.731

Franklin street .and West Washington
'Btl'efitrl" *' ‘ > .
i :ltemw'No. fir-Maintenance. and 1» th
826.83.)»Tbere areibout sixty unless shovels

Maintenonco-ot- eouipnientl‘ "
. f‘steam. Vprollers. , crush‘ers,
‘ autozandarood‘. machines; '. ‘ , 1

item no. 2-933322); Represents.
a coat or hand tools, suchaspicke,
. mattocks. drills, hammers,-

574.96"

 
 
 
 

 

 

 

 

accumulbteséoost-“ottrepnt‘rssodstablesssucum can: .
e streets accordingltocrote'a- floor, stallbonrdsig manger»
. . in, magscrmwj .flt§-'g- ,7 x, g
i1 .lt‘elni- No;- Efittbiltltlilig Represents
o " the "new 1' bar ‘ insulin
or District and _ cor-rm:

construction, Debris “

a

33.72180
pineal '

o’ .‘
o -_»

were.
. , , #Mflmw - 1.00m...
streets cadmium-the .m

 
 

mill-ll! 9.11 that

qpnt- at traffic and» the’t‘gonera, loo {Pur'caaiarotmewcsaui

be cleaned each springj and ‘ , ,
a“ fail. if weassume titty, miles for th tho“ cost.
a has our estimate, each opera! .
i" would mean 1‘00 muss organist-s ,0 ‘ .
30”” mini or..~zoo,.nliea, cleaned for- the year,
‘ ' " ' e sewn:

 
 
 
 
 
 
 

.ineiuddn'gaomce: equipment; .
.-‘t’y.pebe_lrtterland "Ford" “
‘ automobile)“. .r. . _.‘..$ 4- .
' ; engineering , ;“

ao-

 
 

 
 

tli‘egdpsi, quid where possible;
dust. In at “about '

 

 

 

Mens 0

Rumhhsorofé‘newgre‘qmpmont,..7 y . .‘ . *

Visions _

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Storage;
4,800 Squ'arg Feet.
printouts“

‘ To "reduce our

 

 
 
 
 
 

 
 
 
 
 
 
 
 
 
 
 
 

Loading scan from the Connecticut Digital Archive…
100% · drag to pan, double-click to zoom
page scan